Quick Guide for Ordinary Tail Plate Installation (Installation Sequence)
1. Dismantling and cutting (taillights, license plates, tow hooks, spare tires, rear protection, etc.)
Do not destroy the installation of the removed product, which is convenient for reinstallation.
2. Spot welding positioning transition plate (no transition plate can be ignored) and U-shaped frame positioning tooling.
The transition board cannot be oversized and adjusted to be flush and centered with the bottom surface of the carriage.
3. U-shaped frame screw connection positioning + adjust the installation height of the square tube of the main frame
Be careful with high-pressure oil pipes when withdrawing the forklift and lowering the U-shaped frame.
Be careful not to bump the high-pressure oil pipe during installation.
4. The connecting plate is welded to the frame section of the automobile, and the holes are drilled, and the bolts are fastened to fasten the tail plate of the automobile, and the connecting plate and the square tube of the main frame are fully welded.
5. Weld the over-board to fix the board.
6. Withdraw the forklift truck tailgate installation, put down the U-shaped frame, and remove the U-shaped frame positioning tool.
Be careful with high-pressure oil pipes when withdrawing the forklift and lowering the U-shaped frame.
7. Pass through the panel, connect various power lines, signal lines, oil inlet and outlet pipes, and air pipes, and adjust the tail plate several times in a row until it is flush with the bottom surface of the carriage and keeps it centered on the left and right, and installs and adjusts the limit switch.
10. Restore taillights, license plates, tow hooks, spare tires, wires and cables, etc.
8. Install anti-collision blocks (note the position), add hooks, and safety chains (note that the length should be appropriate).
9. Check and confirm the action of the tail lift (no load and load check, no overload).
10. Restore taillights, license plates, tow hooks, spare tires, wires and cables, etc.
After restoring the installation, there must be no interference with the movement of the tailgate.
11. The welding part is painted to prevent rust.
Post time: Jan-17-2023